Cache Public Schools Bus Charging Stations

Located in Cache, Oklahoma at the bus maintenance facility, Seaton Construction dug a 115′ x 2′ x 4′ trench for the electrical conduits and poured six 3′ x 3′ x 1’6″ charger pads and three 4′ x 1′ piers for utility, as well as 24 bollards for this project. These charging stations will be utilized by Cache Public Schools for Electric Bus charging, enhancing the facility’s capabilities for sustainable transportation.




